Get complete information related to latest Pipe Coupling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pipe Coupling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pipe Coupling Tenders.
Tender For corrigendum : supply of spares of id fan fd fan of cdu 1 - coupling, pin bush type spacer,pn8 , brg hsg, fixed end, pn6 , brg hsg, free end, pn7 , coupling, pin bush type spacer,pn7 , brg hsg, fixed end, pn5 , brg hsg, free end, pn6 , inlet filter size 610x610x50, pn 19 , labyrinth shaft seal assembly, pn 15 , labyrinth shaft seal assembly, pn 16 , impeller with shaft and hub, pn 4 and 5 , impeller with shaft and hub, pn 3 and 4
Tender For bid to ras providing of custom bid for services - custom bid for services - hrm assisting in preventive maintenance-1.0 assisting in preventive maintenance in hrm mechanical , the following works are to be carried out through-out the contract period , 2) preventive maintenance jobs based on daily monitoring basis: , a) daily monitoring of all hydraulic pipelines and attending the leakage (fitting changing, damaged , "o" ring changing, pipeline crack welding, etc.). , b) dally monitoring of sm top housing servo valve stand to identify moog & servo valve block , seating 'o' ring damage to avoid oil leakage. , c) daily monitoring of sm equipment like side guide, pinch roll hydraulic cylinder, feed/table roll , rotation, non-rotating rolls for jamming / bearing damage, air leakage identification and arresting. d). daily monitoring of internal cooling valve system condition, removal of steam locking in pipeline , and damaged hose (water) changing. , 2) assisting in mill equipment downtime / delays: , during equipment downtime/delays in hrm mechanical area, proposed man power shall be utilized to restore the mill at the earliest possible time. they will also be utilized for carry out observation / inspection points noted during rolling time to ensure equipment availability. , 3) area jobs (re-heating furnace, roughing mill, steckel mill, down coiler) a) re-heating furnace jobs , 1) rhf charging/discharging gear box connecting drive shaft flange bolts checking/changing. 2) rhf charging/discharging door chain guide roll greasing & chain greasing. , 3) rhf charging/discharging arm gearbox oil level checking & coupling bolts checking. , 4) rhf charging/discharging arm liner bolts tightness checking & replacement. , 5) rhf zone valves (gas & air) servicing & greasing. , 6) any other jobs assigned by qa/ea. , b) roughing mill jobs , 1) rm approach roller table rolls, front and rear mill table rolls, gear coupling welding. , 2) rm edger lower & upper fixed beam fixations changing. , 3) rm edger upper and lower fixed beam worn out portions build up by welding & grinding. , 4) rm main drive spindle balancing guide block fixation checking. , 5) rm main screw down screw clutch spring tension adjusting, cleaning & lubrication. , 6) rm uj joint cover bolts & flange bolts checking & changing. , 7) rm work roll cooling nozzle flushing and changing. , 8) rm work roll wiper pad changing. , 9) cobble pusher arms alignment., 10) cobble pusher extended platform repair work like uprooted support beam, web welding in case of , break down along plate pushing. , 11) crop shear gap/overlap adjusting locks servicing. , 12) crop shear side guide line plate groove welding. , 13) crop shear side guide repositioning during t bar hitting. , 14) any other jobs assigned by oa/ea , c) steckel mill jobs , 1) sm dust removal apron position / welding , 2) sm entry & exit retractable roller table roll cooling pipe checking, damaged pipe changing, both , side vertical apron groove welding, coupling welding. , 3) sm entry/exit side guide cross spray damaged nozzle changing and damaged/uprooted nozzle , block changing/welding. , 4) sm entry/exit cross spray diaphragm valve servicing/changing. , 5) sm entry/exit deflector rolls bearing housing fixation tightening and shim addition. , 6) sm entry/exit flap and bottom plate assembly fixation tightening and elongated bolts changing. 7) sm guide synchronizing shaft fixations checking / changing. , 8) sm main drive shaft cooper bearing fixation tie rod fixation, gulding block bolts tightening , 9) sm pinch roll de-scaler roll to hydraulic cylinder lock checking and welding/changing. , 10) sm pinch roll split apron repositioning & base stool welding. , 11) sm roll cooling flushing by removing all nozzles from zone i & ii & fixing back. , 12) sm wobbler liner plate bolts, wobbler to uj bolts tightening and uj to drive spindle flange bolts , tightening.. , 13) sm work roll
Tender For supply of supporting hook for screw coupling with bracket. drawing no. : icf's drg. no. t-2-3-013, alt. j/3, item nos. 1 to 3 in assembled condition. material and specification :(a)item no.1 (part drg. no.t -2-3-012, alt. l /2) of assembly drg. no.t-2-3-013, alt. j/3, consists of two items, item no.1 (flat bar): ma tl. to is:2062-2011, amend. 1/2012, gr. e250cuc and item no. 2 (hook): matl. to is:2062-2011, amend. 1/2012, gr.e250c (b)item no. 2 (part drg. no. t-1-2-020, alt. e/2) of assembly drg. no. t-2-3-013, alt. j/ 3: matl. to is:2062-2011, amend. 1/2012, gr. e250a (c)item no.3 of assembly drg. no. t-2-3-013, alt. j/ 3: matl. as per drg. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of various signaling spares of faiveley transport make - drive screw assembly for psd , drive screw assembly for ped , centre trolley assembly , coupling device , extremity trolley assembly , lh bearing bracket , fork assembly right , fork assembly left , opening end stop , locking end stop , unlocking device , unlocking set cable , leaf open switch , right leaf locked switch , left leaf locked switch , manual release switch , lower eed stopper assembly , multy function timer , door control unit , hanger rail for psd , dc motor , bearing assembly , hanger rail for ped , steel wire
Tender For supply of screw coupling assembly (enhanced) to rdso sk-99001, alt.4 and as per rdso spec. no. c-9505 revised in august 2001. [ warranty period: 30 months after the date of delivery ]
Tender For supply of enhanced screw coupling assembly to rdso sk-99001, alt-4, specn.no. rdso c-9 505,(revised) aug.01 with amdt.1 of sep 2016 [ warranty period: 30 months after the date of delivery ]